December 1-15


Shoveling the snow

Will help snow melt. Next day will be above 32 degrees

Looking south

Attic with ceiling vent looking north

Underlayment is translucent yet keeps water out

A spot that needs fixing

Nails from the anchor for the safety ropes

2 boards are loose to the right of the vent

Roof from inside shows boards for pouring concrete basement

It's cold up here

Placing the shingles for spacing before nailing

Shingles are tucked under shingle below until nailed


Time measurements: 45 min per row


Horizontal level


Half done


Almost to the top


806 North 4th Stret

Tiles are slightly higher on left. Roof is lower on right.
Remaining rows will compensate

Ladder lift after snow melted

Shingle Hoist On Ladder

1.5 tabs on left side, then 1 tab
don't put a 1/2 tab next to the roof edge

1036 nails 1.25 inch weighs 5 pounds for $11

Snow and shovel

5 inches vertical

6 inches horizontal

Bringing down the middle ladder

Finishing up

East roof

West roof

Bringing down tool box

Ladder lift

Removing the safety boards

10 red braces

Finished

Finished!

Main roof is finally finished!

Victory